Installing or modifying an antenna system: complete federal land-use and public consultation before construction

Check exclusions and the local protocol, notify affected people, respond in good faith and finish the process before construction.

Priority

A municipal permit or lease does not complete the federal process. The proponent may not begin installation before the applicable process is finished.

Confirm the scope

Describe location, height, structure, equipment, visibility, access, environment and compliance with Safety Code 6 and technical standards.

Prepare the information

Ask the land-use authority whether a local protocol exists and carefully check federal exclusions.

Complete the process

Prepare notice, radius, plans, site rationale and public consultation in both official languages when the procedure requires it.

Keep follow-up records

Answer concerns, document resolution attempts and obtain municipal concurrence or ISED involvement before construction.

Antenna systems procedure — ISED

Version française →

Sources and limits

Official sources are linked in the guide. Checked August 29, 2026; confirm current rules, forms and deadlines with the responsible authority.

General information based on federal and national rules; provincial rules may differ. Confirm with the official body before acting. Last reviewed : 2026-08-29.